April 2019 was a significant month for our repair and renewal efforts for our church building here at Saint John. The transformation of the Liturgical environment became truly apparent, along with the substantial infrastructure improvements (lighting, sound, plumbing). By bringing down the scaffolding early, we are now able to move forward with the flooring and new altar, both of which are critical steps to complete the church sooner than anticipated.
To top it off (literally), our steeple arrived and was fastened to the completed roof. The new speakers will be able to sound any bells we would like to play, and could even broadcast our Mass to the entire local area, if needed.
Here are some of the highlights:
April 1, 2019
Marble for the Altar Wall Marble fits together like a glove It is going all the way up! Insulation will help keep the heat out and the cool in Scaffolding helps repair the ceiling New 2-tone staining of the ceiling warms up the entire Sanctuary
April 2, 2019
Upper Ceiling gets the 2-tone stain New Lighting Cans are installed Frames painted bronze around all stained glass Large Central Window will shine with a new light at night Special winch helps get the marble and Cruxifix onto the Altar Wall
April 8, 2019
Many of our light fixtures have been retrofitted for LED (energy efficient) and so they can be on the central dimming system New interior doors are all glass, including Confessional Doors
April 11, 2019
Altar Wall taking shape Wings are now completed with new lighting New Crucifix is delivered from Italy!
April 15, 2019
New Altar Lighting Bar is fixed to the beams instead of hanging from the ceiling New Crucifix! Closer Close-Up Realistic Corpus
April 25, 2019
Steeple and Cross arrive Hoisting the Steeple Up it goes! Placing on our Roof Distance and you can still see it Reminder of the Bell Tower A Cross to be Seen Throughout the Area
Scaffolding Coming Down Tons of metal and wood used to repair our church Finally, a view of the ceiling from the ground! Gorgous contrast warms the entire Sanctuary
April 29, 2019
Eagle Glass going into every exterior door of the church Scaffolding down and flooring starting immediately Beautiful Crucifix, marble, organ speakers and ceiling compliment each other and our faith!
Now we get to see what is coming in May! Please stay tuned!